Ganadhip / Services / Pharmaceutical and industrial

Pharmaceutical and industrial projects

Pharma and industrial work has to be right the first time

Your facility is inspected years after handover, so the floor, the wall joints and the records all have to hold up. We build to that from the first day, and we do it without stopping the lines you already have running.

Why project heads call us

What project heads ask about first

  • We build around your shift pattern

    The new block goes up in stages while your existing lines keep producing. The method statement showing how comes with the quotation.

  • Every casting is cube tested in our own lab

    Cube samples go to our site lab. The report is in your file the same week, ready to attach to your qualification protocols.

  • Our machines and our crews are ours

    20,000 sqm of cup lock scaffolding and 20,000 sqm of steel shuttering, owned outright. 150 people on our rolls, 35 of them engineers.

Scope

What we are usually asked to build

Most of our work is repeat work from the same companies. New scope is quoted the same way as the last one.

01

Clean room civil works

Rounded corners and sealed floors, so dirt has nowhere to sit. Panelling coordinated with your validation team.

02

Foundations for process equipment

Slabs and plinths that hold heavy machines for years without cracking, set out to the vendor drawing.

03

Expansion inside a working plant

Phased around your shifts, with dust and noise controlled so the existing block keeps producing.

04

Utilities, roads and effluent lines

Underground lines, effluent networks, tank foundations, pipe supports and plant roads that take loaded tankers every day.

Revised Schedule M

Binding on every drug manufacturer since 1 January 2026

The revised Schedule M applies to every drug manufacturer in India, including MSME units whose extension ran out on 31 December 2025. Much of what it asks for is civil work: room finishes, layouts that prevent mix ups, and the building side of HVAC and water systems.

  • Coving, sealed floors and wall joints built to the cleanliness grade
  • HVAC and water system civil interfaces built to the qualification drawing
  • Documentation handed over in the format your QA team attaches to IQ and OQ protocols
  • A method statement showing how existing production keeps running while we build
Scope

What we build on industrial sites

Quoted per item, with the stage and the date written next to the rate.

01

Factory and warehouse structures

Foundations, columns, roof structures and floors, set out to your consultant's drawings.

02

Plant roads and hardstanding

Roads and yards built to take loaded tankers and trailers every day.

03

Utilities and effluent networks

Underground lines, drains, effluent networks, tank foundations and pipe supports.

04

Structure work for builders

Column to slab structure on programme, with a cube test on every casting and the report handed over.

Equipment and lab

We own our machines, so the start date we give you is real

If machines are rented, work starts only when the rental yard sends them. Our machines are ready from day one. We also test our concrete on site, so there is no waiting for an outside lab.

  • 20,000 sqm of cup lock scaffolding
  • 20,000 sqm of steel shuttering plates
  • Excavators, rollers, rammers and on-site concrete batching
  • Our own lab: cube testing, slump cones and IS sieves
  • 35 engineers and quality staff, 150 people in total
Scaffolding and formwork
Safety and labour

Asked in every supplier audit

Induction before anyone starts, checks on height work and on scaffolding, and a wage register kept for every crew on site. Accommodation, sanitation and age verification are part of running the job. If your audit team wants to see the records, we will send them.

Industrial structure under construction
Scale

What we do not have

Our equipment is scaled for industrial work. We do not run a tower crane, a passenger hoist or aluminium formwork for repetitive high rise floors. If your job needs those, tell us early. We will clearly tell you if this work is right for us.

What we do have is cup lock scaffolding, steel shuttering, batching on site and a testing lab, and crews who stay with us because they are paid on the fixed date.

Clients

Companies we work for

22 pharmaceutical and industrial clients across Telangana and Andhra Pradesh. Once a pharma company approves us as a vendor, it keeps giving us the next job. That is why most of our work is repeat work.

We have confidentiality agreements with these companies. We can share project details on request.

Questions

Questions people ask

Short answers. For more details, ask us on WhatsApp.

01

Can you build inside a pharma plant that is still running?

Yes. The work is phased around your shift pattern so existing lines keep producing, and the method statement showing how comes with the quotation.

02

Do you handle the civil requirements of the revised Schedule M?

Yes. Room finishes to the cleanliness grade, HVAC and water system civil interfaces built to the qualification drawing, and documentation handed over in the format your QA team attaches to IQ and OQ protocols.

03

How is the concrete tested?

Cube samples from every casting go to our own site lab. Seven day and twenty eight day results are filed against the pour reference and the report goes into your file.

04

Where do you build pharmaceutical and industrial projects?

Genome Valley, Patancheru, Pashamylaram, Bollaram, Jeedimetla, Bonthapally, Gaddapotharam and across Telangana, and Visakhapatnam, JNPC Parawada and Pydibhimavaram in Andhra Pradesh.

Tell us the project, the location and your timeline

We will call you back, mostly the same day. If this work is not right for us, we will tell you clearly.